S Smith Boulevard
National Grid named by listing
4 bank records selected
Two dated observations per bank.
Archive comparison on page 2.
At National Grid’s February 24 refresh, Trinity TB 6 showed 63.800 MW. At the March 25 refresh, it showed 39.108 MW. February’s zero recorded peak made headroom equal the bank rating.
National Grid named by listing
4 bank records selected
Two dated observations per bank.
Archive comparison on page 2.
Central Hudson named by listing
6 Central Hudson records
Address match: Montgomery.
Listing: Hamptonburgh.
O&R named by listing
26 O&R load-serving headroom records
Source dates: April 2 to October 2, 2026. Rating minus seasonal peak; an N-1 outage limit may be lower.
Serving utility unconfirmed
14 United Illuminating records
EV hosting capacity. Site address from a CT DEEP brownfield listing.
700 Smith Boulevard, Albany, NY 12202. The nearest bank’s published margin changes from 63.800 MW to 39.108 MW between the utility refresh dates below.
| Bank record | Centroid distance / mi | Feb 24, 2026 MW | Mar 25, 2026 MW | Bank peak Feb → Mar |
|---|---|---|---|---|
| TRINITY TB 6 | 1.10 | 63.800 | 39.108 | Zero → positive |
| TRINITY TB 7 | 1.44 | 11.700 | 9.414 | Zero → positive |
| DELAWARE AVE TB 2 | 1.48 | 14.700 | 8.115 | Zero → positive |
| RENSSELAER TB 1 | 1.64 | 5.037 | 5.037 | Positive → positive |
The first three banks have positive March peaks and unchanged ratings. Rensselaer’s headroom is unchanged between refreshes. Treat a National Grid zero-peak margin as equipment rating until the utility confirms how to interpret it.
Across the archived files, of 78 February zero-peak banks, 61 gained positive peaks and 17 stayed at zero.
The four nearest National Grid records are shown. Distance is measured from the saved address match to each bank’s combined feeder-line centroid; National Grid identifies the supplying equipment.
Utility refresh dates: February 24 and March 25, 2026. Archive collections: March 12 and April 1, 2026. Values use the sub_load_capacity_headroom field and are rounded to three decimals. The portal guide describes electrification estimates for transport and heating.
The four sites return different metrics and different date types.
| Site | Meaning of the published metric | Date and provenance |
|---|---|---|
| Goshen O&R | Load-serving headroom. Native MW from published bank rating minus seasonal peak. | Utility source dates: April 2 to October 2, 2026. Source fields and system plan support the interpretation. |
| Smith National Grid | Electrification headroom. The portal describes transport and heating screening. | Utility refresh dates and archive collection dates are separated on page 2. Port of Albany listing names National Grid. |
| Neelytown Central Hudson | Feeder-derived sum. Aggregated feeder headroom; a shared transformer rating can constrain the sum. | Utility source date: March 31, 2026. Saved address match says Montgomery; the property listing says Hamptonburgh. |
| Seaview United Illuminating | EV hosting capacity. Feeder values grouped by substation. | No utility-reported source date. The CT DEEP brownfield listing supplies the address and names no serving utility. |
Goshen, Neelytown and Seaview retain the saved screen’s 10-mile inventory boundary for a consistent search area. Utility service territory comes from the utility. Records are summer-season except Seaview’s annual view.
Neelytown also returns 10 O&R records as neighboring-utility context. NYSEG values and dates are withheld: 3 records near Smith and 2 near Neelytown.
Each question follows a specific evidence issue. A utility will ask for the parcel boundary and proposed operating profile to identify the relevant equipment.
700 Smith Boulevard
Albany, NY 12202
National Grid
“Which bank would supply the Smith Boulevard parcel, and how should its electrification headroom be applied to the proposed industrial use? The nearest Trinity record has a zero February peak and a positive March peak. Please confirm the applicable record and source date.”
39 Police Drive
Goshen, NY 10924
O&R
“For the Police Drive parcel, which bank would supply the site, and what loading limit applies with one transformer out of service?”
The property listing names O&R; the contingency limit remains a utility question.
230 Neelytown Road
Hamptonburgh, NY 12549
Central Hudson
“Can you confirm the service location for the parcel listed in Hamptonburgh and address-matched to Montgomery? Which shared transformer limit applies to its feeder-derived headroom?”
The owner’s parcel boundary would settle the Montgomery/Hamptonburgh question.
440 Bunnell Street
Bridgeport, CT 06607
Serving utility unconfirmed
“Do you serve the Bunnell Block parcel identified in the CT DEEP listing? If so, can you provide dated equipment-level load-serving information for the proposed use?”
The brownfield listing supplies the site address; the available screen reports EV hosting capacity.